Supervision for Solar Plant Installation – 1 MW
Home / Soil Stabilization Study for Highway
Project Detail
Client : Local EPC Company
Location : Islamabad
Duration : 6 Months
Supervision for Solar Plant Installation – 1 MW
COSMIC Engineering supervised the installation of a 1 MW solar plant in Islamabad.
Scope included daily site inspections, QA/QC, material verification, and progress reporting.
The project ensured high-quality, on-schedule, and safe installation of the solar facility.
Scope:
- Daily site inspections
- QA/QC
- Material verification
- Progress reporting

COSMIC Engineering provided comprehensive supervision for the 1 MW solar plant installation in Islamabad for a local EPC company. Over a 6-month period, the scope included daily site inspections, quality assurance and control, material verification, and progress reporting, ensuring that the solar plant was installed efficiently, safely, and to the highest quality standards.