Feasibility & FFA Study – 30 MW Hydro

COSMIC Engineering conducted a feasibility and firm flow availability (FFA) study for a 30 MW hydropower project in Skardu.
The project included hydrological analysis, energy potential assessment, and site evaluation.
It provided critical insights for project viability and optimal hydro design.

Scope:

COSMIC Engineering carried out a feasibility and firm flow availability (FFA) study for a 30 MW hydropower project in Skardu. The study involved detailed hydrological analysis, energy potential assessment, and site evaluation, delivering essential information to guide project planning, design, and decision-making for sustainable hydropower development.