Cosmic Engineering Consultant

Air Traffic Control Tower and ARFF at Skardu International Airport

Project Detail

Client:

Pakistan Airports Authority (PAA)

Project Type:

Airport Infrastructure Development

Project Category:

Air Traffic Control (ATC) Tower, Fire Station & Allied Facilities3

Project Overview

This project involves consultancy services for the preparation of detailed design, procurement support, and construction supervision for the development of a new Air Traffic Control Tower (ATCT), Fire Station, and allied facilities at Skardu International Airport, Pakistan.

The consultancy assignment covers the complete planning and design phase, including concept development, engineering design, cost estimation, tender documentation, procurement assistance, and construction supervision. The project is intended to strengthen airport operational capabilities, enhance air traffic management, and improve aviation safety infrastructure at Skardu International Airport.

Project Duration

Project Phase
Duration
Phase-I Planning & Design Services
8.5 Months
Phase-II Construction Site Supervision
24 Months
Defect Notification Period (DNP)
12 Months
Total Project Duration
36 Months

Project Scope of Services

Key Deliverables

Phase-I Planning & Design

  • Concept Study / Design Basis of Project
  • Preliminary Design and Rough Cost Estimates
  • Engineer’s Cost Estimate (PC-I)
  • Tender Documents, Technical Specifications & BOQ
  • Procurement and Bidding Process Support
  • Bid Evaluation Report
  • Contract Award Recommendation

Phase-II Construction Supervision

  • Construction Site Supervision and Contract Administration
  • Inspection and Post-Construction Services
  • Operationalization and System Integration Support
  • Training and Capacity Building for Client Personnel
  • Maintenance Manuals and Scheduled Maintenance Plans
  • Certified As-Built Drawings (PC-IV)

Project Objective

The objective of this project is to develop modern air traffic control and airport emergency response infrastructure at Skardu International Airport through the construction of a new Air Traffic Control Tower, Fire Station, and supporting facilities. The project aims to enhance air navigation services, improve operational safety, and support the growing aviation requirements of the region.