Project Detail

Client: Power Utility / EPC Contractor

220kV Transmission Line Feasibility

COSMIC Engineering conducted a feasibility study for a 220kV transmission line project.
The study assessed route options, technical viability, and implementation constraints.
It supported safe, efficient, and cost-effective power transmission planning.

Scope:

COSMIC Engineering carried out a comprehensive feasibility study for a 220kV transmission line. The scope included evaluation of route alternatives, technical feasibility, and key implementation considerations, providing a clear basis for informed decision-making and efficient development of high-voltage power transmission infrastructure.